Case 32025.12 ~ 2026.06Kumsol Communications × Gazet AI

AG Office — a failed ERP project and how it changed the way I build

Proposed and led a marketing ERP co-developed with Gazet AI to replace team-by-team spreadsheets. The project failed: AI capabilities advanced much faster than the build could keep up with. That failure is what made me start building tools myself with AI coding agents.

  • FailedThe ERP was not completed or put into operation: AI capabilities advanced much faster than the development could keep up with.
  • Co-development → building it myselfAfterwards I started building tools directly with AI coding agents (the contest platform, the search monitor and my agent operating system).
Role
Project Lead (co-developed with Gazet AI)
Organization
Kumsol Communications × Gazet AI

What I decided

  • Revenue stalled even as new clients signed. I suspected churn but had no data to check it, so I proposed a joint ERP build to Gazet AI and designed the data structure, productivity metrics and KPI dashboard.
  • The project failed because AI capabilities moved much faster than the development speed; stopping it was a decision everyone involved made together.
  • Before this I did not build software myself: I chose existing AI tools to raise the company’s productivity and planned systems that partners and outside development companies built. After this failure I started building the tools I need with AI coding agents, owning requirements, review and release myself.

Full case study (Korean) →